CURRENT INFORMATION

Operational information

Daily storage inventory in Zone MND ESG
From:
To:
Date: Current capacity in TWh Withdrawals (GWh/day) Injections (GWh/day)
21.10.2026 1.030 0 0
22.10.2026 1.030 0 0
23.10.2026 1.049 0 18.854
24.10.2026 1.051 3.896 5.552
25.10.2026 1.055 0.276 4.800
26.10.2026 1.048 9.352 1.656
27.10.2026 1.033 16.424 1.656
28.10.2026 1.011 23.536 1.656
29.10.2026 0.989 23.536 1.656
30.10.2026 0.981 9.312 1.656
Shutdowns and maintenance
Date of Limitation Description of Storage Services Limitation – Zone Other Restrictions Additional Information
27.09.2027, 6:00 - 08.10.2027, 6:00 65% of both injection and withdrawal not available   Maintenance - UGS Stockstadt
13.07.2026, 6:00 - 18.07.2026, 6:00 65% of both injection and withdrawal not available   Maintenance - UGS Stockstadt
05.05.2026, 6:00 - 13.07.2026, 6:00 35% of both injection and withdrawal not available   Maintenance - UGS Stockstadt
13.04. - 30.04.2026 40% of injection rates and 100% of withdrawal rates not available at the time of limitation For more information please see OGE Website TSO Maintenance on OGE CS Gernsheim
Expected 2 weeks during October 2025 up to 33% of both withdrawal and injection rates could be limited For more information please see OGE Website  TSO Maintenance on OGE Gernsheim station
16.9. - 18.9.2024, 6:00 100% of withdrawal rates valid at time of limitation, injection rates unaffected   Reactive maintenance due to technical failure
14.8. - 13.9.2024 63% of withdrawal rate will not/is not available at time of limitation   TSO Maintenance - Main-Neckar pipeline
6.2. – 20.2.2023 100% of withdrawal rates valid at time of limitation, injection rates unaffected   Reactive maintenance at UGS Hähnlein due to technical failure
23.6.2021, 4 hrs 50% of injection rates valid at time of limitation   Maintenance – UGS Haehnlein
1.10.-20.10.2018 10% of withdrawal rate will not/is not available at time of limitation   Workover Stockstadt S1 – UGS Stockstadt
1.9.-20.9.2018 15% of withdrawal rate will not/is not available at time of limitationung nicht verfügbar   Installation of filterseparator UGS Hähnlein
20.11.-24.11.2017 50% of withdrawal and injection rates valid at time of limitation   Installation of turbine (commercial measurement ) UGS Stockstadt
31.8.2016 (7:00-17:00) 50% of withdrawal rates valid at time of limitation   Maintenance at UGS Hähnlein
30.8.2016 (7:00-17:00) 50% of injection rates valid at time of limitation   Maintenance at UGS Hähnlein
4.8.2016 (7:00-17:00) 50% of withdrawal/injection rates valid at time of limitation   Maintenance at UGS Hähnlein
19.7.2016-21.7.2016 50% of withdrawal/injection rates valid at time of limitation  

Maintenance on Main-Neckar pipeline (see OGE web pages)