CURRENT INFORMATION

Operational information

Daily storage inventory in Zone MND ESG
From:
To:
Date: Current capacity in TWh Withdrawals (GWh/day) Injections (GWh/day)
22.4.2026 0.234 0 0
23.4.2026 0.234 0 0
24.4.2026 0.234 0 0
25.4.2026 0.234 0 0
26.4.2026 0.234 0 0
27.4.2026 0.234 0 0
28.4.2026 0.247 0 12.586
29.4.2026 0.251 0 4.095
30.4.2026 0.262 0 11.361
1.5.2026 0.262 0 0
Shutdowns and maintenance
Date of Limitation Description of Storage Services Limitation – Zone Other Restrictions Additional Information
13.07.2026, 6:00 - 18.07.2026, 6:00 65% of both injection and withdrawal not available   Maintenance - UGS Stockstadt
05.05.2026, 6:00 - 13.07.2026, 6:00 35% of both injection and withdrawal not available   Maintenance - UGS Stockstadt
13.04. - 30.04.2026 40% of injection rates and 100% of withdrawal rates not available at the time of limitation For more information please see OGE Website TSO Maintenance on OGE CS Gernsheim
Expected 2 weeks during October 2025 up to 33% of both withdrawal and injection rates could be limited For more information please see OGE Website  TSO Maintenance on OGE Gernsheim station
16.9. - 18.9.2024, 6:00 100% of withdrawal rates valid at time of limitation, injection rates unaffected   Reactive maintenance due to technical failure
14.8. - 13.9.2024 63% of withdrawal rate will not/is not available at time of limitation   TSO Maintenance - Main-Neckar pipeline
6.2. – 20.2.2023 100% of withdrawal rates valid at time of limitation, injection rates unaffected   Reactive maintenance at UGS Hähnlein due to technical failure
23.6.2021, 4 hrs 50% of injection rates valid at time of limitation   Maintenance – UGS Haehnlein
1.10.-20.10.2018 10% of withdrawal rate will not/is not available at time of limitation   Workover Stockstadt S1 – UGS Stockstadt
1.9.-20.9.2018 15% of withdrawal rate will not/is not available at time of limitationung nicht verfügbar   Installation of filterseparator UGS Hähnlein
20.11.-24.11.2017 50% of withdrawal and injection rates valid at time of limitation   Installation of turbine (commercial measurement ) UGS Stockstadt
31.8.2016 (7:00-17:00) 50% of withdrawal rates valid at time of limitation   Maintenance at UGS Hähnlein
30.8.2016 (7:00-17:00) 50% of injection rates valid at time of limitation   Maintenance at UGS Hähnlein
4.8.2016 (7:00-17:00) 50% of withdrawal/injection rates valid at time of limitation   Maintenance at UGS Hähnlein
19.7.2016-21.7.2016 50% of withdrawal/injection rates valid at time of limitation  

Maintenance on Main-Neckar pipeline (see OGE web pages)