CURRENT INFORMATION

Operational information

Daily storage inventory in Zone MND ESG
From:
To:
Date: Current capacity in TWh Withdrawals (GWh/day) Injections (GWh/day)
14.8.2025 1.938 0 3.903
15.8.2025 1.949 0 11.004
16.8.2025 1.960 0 10.783
17.8.2025 1.971 0 10.636
18.8.2025 1.975 0 4.609
19.8.2025 1.985 0 10.114
20.8.2025 1.990 0 4.302
21.8.2025 2.000 0 9.950
22.8.2025 2.010 0 9.912
23.8.2025 2.019 0 9.715
Shutdowns and maintenance
Date of Limitation Description of Storage Services Limitation – Zone Other Restrictions Additional Information
Expected 2 weeks during October 2025 up to 33% of both withdrawal and injection rates could be limited For more information please see OGE Website  TSO Maintenance on OGE Gernsheim station
16.9. - 18.9.2024, 6:00 100% of withdrawal rates valid at time of limitation, injection rates unaffected   Reactive maintenance due to technical failure
14.8. - 13.9.2024 63% of withdrawal rate will not/is not available at time of limitation   TSO Maintenance - Main-Neckar pipeline
6.2. – 20.2.2023 100% of withdrawal rates valid at time of limitation, injection rates unaffected   Reactive maintenance at UGS Hähnlein due to technical failure
23.6.2021, 4 hrs 50% of injection rates valid at time of limitation   Maintenance – UGS Haehnlein
1.10.-20.10.2018 10% of withdrawal rate will not/is not available at time of limitation   Workover Stockstadt S1 – UGS Stockstadt
1.9.-20.9.2018 15% of withdrawal rate will not/is not available at time of limitationung nicht verfügbar   Installation of filterseparator UGS Hähnlein
20.11.-24.11.2017 50% of withdrawal and injection rates valid at time of limitation   Installation of turbine (commercial measurement ) UGS Stockstadt
31.8.2016 (7:00-17:00) 50% of withdrawal rates valid at time of limitation   Maintenance at UGS Hähnlein
30.8.2016 (7:00-17:00) 50% of injection rates valid at time of limitation   Maintenance at UGS Hähnlein
4.8.2016 (7:00-17:00) 50% of withdrawal/injection rates valid at time of limitation   Maintenance at UGS Hähnlein
19.7.2016-21.7.2016 50% of withdrawal/injection rates valid at time of limitation  

Maintenance on Main-Neckar pipeline (see OGE web pages)