Limitation of storage services
Date of Limitation | Description of Storage Services Limitation – Zone | Other Restrictions | Additional Information | ||||||||
19.7.2016 – 21.7.2016 |
50% of withdrawal/injection rates valid at time of limitation |
Maintenance on Main-Neckar pipeline (see OGE web pages) | |||||||||
4.8.2016 (7:00 – 17:00) |
50% of withdrawal/injection rates valid at time of limitation |
Maintenance at UGS Hähnlein | |||||||||
30.8.2016 (7:00 – 17:00) |
50% of injection rates valid at time of limitation |
Maintenance at UGS Hähnlein | |||||||||
31.8.2016 (7:00 – 17:00) |
50% of withdrawal rates valid at time of limitation |
Maintenance at UGS Hähnlein | |||||||||
20.11-24.11.2017 | 50% of withdrawal and injection rates valid at time of limitation | Installation of turbine (commercial measurement ) UGS Stockstadt | |||||||||
1.9.-20.9.2018 | 15% of withdrawal rate will not/is not available at time of limitation | Installation of filterseparator UGS Hähnlein | |||||||||
1.10.-20.10.2018 | 10% of withdrawal rate will not/is not available at time of limitation | Workover Stockstadt S1 – UGS Stockstadt | |||||||||
23.6.2021, 4 hrs | 50% of injection rates valid at time of limitation | Maintenance – UGS Haehnlein |
Updated: 05/2021